Contour Construction & Field Drainage - Wolverine Extreme at Casino, NSW
The Wolverine Extreme was the ideal machine to fast-track contour construction and field drainage for the Northern Co-Operative Meat Company at Casino in 2017. For this project, the Wolverine was able to move 700 cubic metres of soil at 1.5km per hour to create contours and banks of up to a metre in height.